Home
|
Login
|
Help
|
|
Dark
Light
|
Ayers
>
Architecture
>
Downstairs Bath Remodel (in progress)
Gallery pages:
1
<
2 of 7
>
Another shot of the tub. The green vertical strip was where the partition was installed before I ripped it out.
Another shot of the tub. The green vertical strip was where the partition was installed before I ripped it out.
Other sizes:
Small
•
M
•
L
•
O
•
save photo
|
Share photo:
links, forums, blogs
|
Gallery pages:
1
<
2 of 7
>
Comments
|
hide gallery comments
|
New comment:
Requires approval
Name:
Email:
Link:
Connect with Facebook
Comment on:
Choose a type
This photo
Entire gallery
|
Rating:
Don't rate
1
2
3
4
5
stars
To foil spammers, enter this code:
in this box:
Code unreadable?